As the second engineer onboard a tanker, presenting a main boiler for survey involves a detailed and structured approach to ensure all components are thoroughly inspected and maintained according to classification society standards. The following steps outline the procedure:
Planning:
- Inform the classification society beforehand and decide on a suitable date and location for the survey.
- Calculate the time required for the survey and ensure it fits within the available time frame.
- Confirm that adequate manpower is available for the task.
- Check for necessary spare parts and place orders to ensure timely delivery.
- Arrange all required tools.
- Review the boiler manual for specific procedures and special instructions.
- Gather all past maintenance, inspection, and survey records.
- Conduct a meeting with all personnel involved to discuss the work and procedures.
- Perform any special checks required before shutting down the boiler.
Before stopping the boiler:
- Inform the duty officer on the bridge about the commencement of work.
- Switch over the boiler, main engine, and diesel generators to Low Sulphur Marine Gas Oil (LSMGO).
- Perform a boiler soot blow to clean the boiler tubes.
- Stop all auxiliary machinery that consumes steam.
Stopping the boiler:
- Change the boiler to manual control.
- Stop boiler firing and carry out post purging for at least five minutes.
- Isolate the boiler.
- Shut the main steam stop valve
- When the boiler pressure drops to 3-4 bar, perform a scum blowdown to remove floating impurities.
- Conduct a bottom blowdown to drain the water
- Before the pressure drops to 2 bar open the vent valve.
- Allow the boiler to cool down sufficiently.
- Once the boiler is confirmed to be drained completely, carefully open the manhole door.
Precautions for entry:
- Ventilate the boiler and check for oxygen and gas content.
- Conduct a risk assessment and follow safe entry procedures as per the company's Safety Management System (SMS).
- Prepare an enclosed space entry permit and obtain signatures from all concerned parties.
Inspection:
Boiler Cleaning:
- Thoroughly clean the boiler on water side, fire side and refractory.
Inspection on Gas side and refractory:
- Check the condition of refractory material for any damage and cracks
- Check for high temperature cracks in front of burner i.e. the back wall of furnace
- Check the floor for any cracks and oil contamination
- Check for signs of overheating near burner surface
- Check for leaks at boiler tube at the plate entry
- Check for carbon deposits/ soot deposits
- Check for restriction of gas passage
- Check the soot blower nozzle.
- Examine the condition of tubes.
- Check the exterior for corrosion, leakage, cracks, and overheating.
- Inspect the condition of insulation, pipes, valves, refractory, and burning equipment.
Waterside Inspection:
- Check the internal condition for scale, sludge and corrosion
- Check the bottom blow-down and scum blow-down pipe from the inside of the boiler for any signs of erosion
- Check for any distortion of boiler bottom plate
- Check for steam bubbling pitting on tubes and wall
- Check for oxygen pitting at waterline and steam space
- Check condition of manhole door, mudhole/ handhole door from the inside of boiler.
- Examine pipelines and valves.
External inspection:
- Check the condtion of boiler support (top bracing)
- Remove insulation and check for corrosion
- Check boiler mounting attachment to the shell
- Check the condition of boiler gauge glass connection
- Check for any leaks from steam gasket
Additional Inspections:
- Overhaul and inspect all boiler mountings.
- Inspect and overhaul safety valves.
- Calibrate pressure gauges.
- Check the condition of Forced Draft (FD) fans, dampers, and linkages.
- Inspect foundation bolts for tightness, corrosion, and fretting.
- Inspect the uptake.
- Measure tube thickness.
Post inspection:
- Reassemble the boiler and follow the proper procedure for firing it up.
- Test and set the safety valve.
- Test all alarms and trips.
- Prepare detailed measurement and inspection reports.
- Ensure all reports are signed by the classification surveyor.
Prepare three copies of the report, duly signed by the classification surveyor:
- One copy is retained by the surveyor.
- One copy is sent to the company.
- One copy is placed in the ship survey file.