Q2 (16 Marks) Safety & Fire Protection
MEP • Written Exam

State the regular routines carried out on the following system:

(a) CO2 Fixed fire-fighting system

(b) Smoke detection system.

Appeared In: Dec 2018

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready
Part (a)

Maintenance of CO2 System

Things to follow before carrying out maintenance,

  • Inform the bridge before going inside the CO2 room.
  • Start ventilation blowers first and the room should be ventilated for some time.
  • Go with a person with proper communication equipment.

Weekly

  • Check all cylinders are properly secured.
  • Make sure that nothing has been placed to interfere with the normal operation of the system
  • Check all the operating levers and their accessories are properly tight.
  • Check clamping.
  • Check valve actuator.

Once every month

  • All the weekly checks
  • Inspect for piping and equipment for mechanical breakage
  • Operate the valve several times and make sure that it does not stick
  • Open the cabinet door and check the alarm and ventilation cut off working.

Once In Every Year

  • All the monthly checks
  • Cylinder should be weighed to determine the CO2 content
  • If the net weight is decreased by 10% of the actual weight, the cylinder should be recharged

Once In Every Two Years

  • All the checks in yearly
  • Blow through all piping with service air @ 25 bar pressure or Co2 to make sure that the line is not blocked

Once In Every Five Year

  • All the above
  • Spring loaded relief valve pressure test @ 180 bar.

10 Yearly

  • Cylinder pressure test @ 250 bar (after the first 10 years, the cylinder is to be pressure tested every 5 years)

15 yearly

  • Pressure testing of the line by a suitable liquid
  • Cylinder to master valve: @ 170 bar
  • Master valve to E/R or Cargo hold valve: @ 80 bar
  • E/R or Cargo hold to nozzle: @ 6-7 bar
Part (b)

Regular Routines for Smoke Detection System

Routine Testing

Smoke, Flame, and Heat Detectors:

  • Test all detectors regularly to ensure functionality.
  • Each detector is tested systematically so that all are tested for at least 3 months.

Manual Call Points:

  • Test manual call points in a phased manner, ensuring every call point is tested within 3 months.

Control Panel Indicators:

  • Verify the operation of all fire detection and alarm control panel indicators weekly by using the lamp/indicator test switch.

Power Supply Tests

  • Annually test the automatic changeover of the power supply to the emergency source to confirm it functions as required during power outages.

Visual Inspections

  • Inspect all detectors visually once a year to check for any signs of damage, tampering, or obstructions that could hinder their operation.

Five-Yearly Maintenance:

  • Perform detailed checks and maintenance of the entire smoke detection system every five years, carried out by qualified service engineers, to ensure long-term reliability and compliance with safety standards.