Q3 (16 Marks) Lubrication & Bearings
MEP • Written Exam

With reference to a cylindrical boiler which has undergone major repairs, explain:

(a) How is the boiler prepared for carrying out hydraulic test?

(b) What is the test pressure to which boiler is subjected to?

(c) What inspection should be made before, during and after the test?

Appeared In: Nov 2022

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready

HYDRAULIC TEST OF A CYLINDRICAL BOILER AFTER MAJOR REPAIRS

Part (a)

How the boiler is prepared for the hydraulic test

  1. Complete all repairs and ensure the boiler is clean (water side and fire side) and all manholes/ handholes are closed with new gaskets.
  2. Isolate the boiler from the steam, feed, fuel and air systems; blank off or secure all connections.
  3. Fit a test pressure gauge (calibrated) and a vent at the highest point.
  4. Fill the boiler completely with water (treated/ clean water) through the feed/ filling connection, venting the air until the boiler is full.
  5. Connect a hydraulic test pump (hand or power) to the boiler.
  6. Ensure all safety valves are gagged/ locked closed (or removed and blanked) so they do not lift during the test.
  7. Ensure the boiler is at a safe, stable condition (cool, no pressure) before starting.
Part (b)

Test pressure to which the boiler is subjected

  • The hydraulic test pressure is typically 1.5 times the working pressure (or as per the Class/ maker's requirement). For a boiler that has undergone major repairs, the test pressure is set by the classification society (usually 1.5 x the design/ working pressure). The pressure is applied slowly and held for the required time (e.g. 15-30 minutes) while the boiler is examined.
Part (c)

Inspection before, during and after the test

Before the test:

  • Inspect the boiler internally and externally for any obvious defects, and confirm all repairs are complete and sound.
  • Check that all openings are closed and the boiler is properly filled and vented.
  • Confirm the test pump, gauge and connections are in order.

During the test:

  • Apply the pressure slowly and steadily.
  • Examine the boiler (all welded seams, tube ends, manhole/ handhole joints, and the repaired areas) for leakage, weeping, distortion or bulging.
  • Hold the test pressure for the required time and observe for any pressure drop or leakage.
  • Check for any deformation/ movement of the boiler structure.

After the test:

  • Relieve the pressure slowly and drain the boiler.
  • Re-inspect the boiler, particularly the repaired areas and the joints, for any permanent deformation, cracks or leaks.
  • Record the test results (pressure, duration, findings) on the test certificate.
  • If the test is satisfactory, the boiler is re-commissioned (refill, reconnect, and bring back on line). If defects are found, they are repaired and the test repeated.
  • The test is witnessed/ approved by the Class surveyor as required.