Q3 (16 Marks) Auxiliary Systems
MEP • Written Exam

Your ship is due for Drydocking. Prepare repair specifications for the following:

(a) Main Engine cooling sea water Overboard valve

(b) Aft winch hydraulic oil pressure line, holed at deck penetration in Steering Compartment

(c) Deck seal of a IG system used in an oil tanker

Appeared In: Jan 2023

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready

REPAIR SPECIFICATIONS FOR DRYDOCKING

Part (a)

Main Engine cooling sea water overboard valve

  • The overboard (sea water) valve is to be overhauled/ repaired. The specification should state:
  • The valve is to be dismantled, the valve and seat inspected for corrosion, pitting, wastage and damage.
  • The valve seat and disc are to be re-faced/ re-ground or renewed as required to give a tight shut-off.
  • The valve spindle/ gland packing is to be renewed; the gland is to be repacked.
  • The valve body is to be inspected for corrosion/ wastage (ultrasonic thickness check) and repaired/ renewed if below the safe thickness.
  • The valve is to be pressure-tested (to the working pressure) after repair to confirm a tight shut-off.
  • The valve is to be re-fitted with new gaskets/ bolts and the flange joint made good.
  • The valve is to be surveyed/ approved by the Class surveyor as required.
Part (b)

Aft winch hydraulic oil pressure line, holed at deck penetration in Steering Compartment

  • The hydraulic oil pressure line is to be repaired. The specification should state:
  • The holed section of the hydraulic line at the deck penetration is to be cut out and renewed with new pipe of the same material/ size/ rating.
  • The new pipe is to be welded/ flanged to the existing line with proper joints.
  • The deck penetration/ gland is to be inspected and made good (renew the gland/ seal) to prevent water ingress and to support the pipe.
  • The hydraulic line is to be pressure-tested (to the system working pressure) after repair to confirm no leaks.
  • The hydraulic system is to be bled/ purged and the winch tested for correct operation.
  • The repair is to be carried out to the maker's/ Class requirements.
Part (c)

Deck seal of an IG (Inert Gas) system used in an oil tanker

  • The deck seal (the water seal/ P.V. breaker of the inert gas system) is to be repaired. The specification should state:
  • The deck seal is to be inspected for corrosion, wastage, cracking and damage.
  • The seal is to be cleaned and the water seal/ P.V. breaker internals inspected.
  • Worn/ damaged parts (the seal plates, the water level control, the non-return/ flame screen) are to be renewed.
  • The seal is to be pressure-tested/ leak-tested to confirm it maintains the inert gas seal.
  • The deck seal is to be re-commissioned and the inert gas system tested for correct operation (maintaining the inert gas pressure/ seal).
  • The repair is to be carried out to the maker's/ Class requirements and surveyed as required.