Persistent leakage at the tube-to-tube plate joint may occur due to one or more of the following reasons:
- Waterside corrosion and pitting caused by poor-quality feed water or improper boiler water treatment, resulting in wastage of the tube ends and tube plate.
- Wastage of the tube plate ligaments due to soot blowing with wet steam, leading to erosion around the tube holes.
- Unequal thermal expansion between the tube and tube plate caused by local overheating or design faults, resulting in loosening of the expanded tube joint.
- Overheating, deformation, or panting of the tube plate, which causes distortion of the tube holes and loss of a tight tube-to-tube plate seal.
Leakage at the tube-to-tube plate connection can result in the following problems:
- Excessive feed water consumption from the cascade tank due to continuous loss of boiler water.
- Continuous running of the boiler feed pump to maintain the boiler water level.
- In the case of severe leakage:
- Low boiler water level.
- Drop in steam pressure.
- Continuous firing of the boiler to maintain steam demand.
- Unstable firing in oil-fired boilers due to fluctuating water level and steam production.
- Leakage of water through boiler check valves when the main engine is stopped.
- White smoke or steam issuing from the funnel, which flashes off immediately after leaving the funnel due to escaping boiler water entering the exhaust gas side.
A permanent repair involves renewal of the leaking tube and proper restoration of the tube-to-tube plate joint. The procedure is as follows:
- Allow the boiler to cool completely and inspect the leaking tube connection.
- Open up the boiler and identify the defective tube for renewal.
- Cut both ends of the leaking tube approximately 50 mm away from the tube plate.
- Remove the remaining tube pieces by:
- Chiselling, or
- Heating and cooling the tube end to produce shrinkage, followed by knocking it out.
- Thoroughly clean and polish the tube holes.
- Carry out a dye penetrant test to check the tube holes for cracks or other minor damage.
- Ensure the diametrical clearance between the new tube and the tube hole is approximately 1.5 mm.
- Thoroughly clean the ends of the new tube.
- Insert the new tube and carefully expand (roll) both ends into the tube plate to obtain a tight, leak-proof joint.
- Ensure the new tube projects at least 6 mm beyond the tube plate.
- Form a proper bell mouth at each tube end. The bell mouth should be approximately 1 mm for every 25 mm of tube outside diameter, plus an additional 1.5 mm.
A properly expanded and bell-mouthed tube, together with sound tube holes and good boiler water treatment, provides a permanent and reliable repair, minimizing the possibility of future leakage.