Q5 (16 Marks) Safety & Fire Protection 🔥 Repeated 4x in exams
MEP • Written Exam

(a) During the weighment of CO2 bottles required for total flooding of Engine room, it was observed that few bottles are less than the original capacity. State the reasons for the same and checks/tests to be made prior refilling.

(b) State how often the CO2 bottles are required to be weighed and pressure tested.

Appeared In: Dec 2025Nov 2024Jul 2022Feb 2018

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready

CO₂ Bottle Weighment – Observations, Causes, and Required Actions

During the weighing of CO₂ bottles used for total flooding of the engine room, if it is found that some bottles have lost more than the permissible limit (generally more than 10% of their original charge), it is considered a serious safety concern. Such a deficiency can compromise the effectiveness of the fixed fire-fighting system and must be addressed immediately.

Reasons for Reduced CO₂ Capacity

The reduction in CO₂ content within the bottles can occur due to several reasons:

  • Leaking Valves: This is the most common cause. Leakage may occur from the main valve or discharge head due to worn-out seals, dirt or debris on the valve seat, or improper tightening.
  • Corrosion of Cylinder: External or internal corrosion can weaken the cylinder wall, leading to very fine pinhole leaks through which gas can gradually escape.
  • Damaged or Defective Bursting Disc: The bursting disc is a safety device designed to rupture at excessive pressure. If it becomes weakened, fatigued, or damaged, it may allow slow leakage of CO₂.
  • Improper Sealing After Maintenance: If the bottles were previously serviced or tested, incorrect reassembly or poor sealing of connections may result in gradual gas loss.

Checks and Tests Before Refilling

Before refilling any CO₂ bottle, it is essential to ensure that the cylinder is structurally sound and safe for reuse:

  • External Visual Inspection: Examine the cylinder for dents, pitting, corrosion, or any signs of overheating.
  • Internal Inspection: Use suitable methods such as a borescope to check for internal corrosion, scaling, or damage.
  • Hydrostatic Pressure Test: The cylinder is filled with water and pressurized (typically up to 1.5 times the working pressure) to check for leaks or permanent deformation.
  • Verification of Tare Weight: The empty weight of the cylinder must be confirmed to ensure that the correct quantity of CO₂ is filled.
  • Valve Overhaul: The valve assembly should be dismantled, inspected, and fitted with new seals, O-rings, and a properly functioning bursting disc.

Frequency of Inspection and Testing

As per IMO guidelines (MSC.1/Circ.1318/Rev.1) and SOLAS requirements, the following inspection schedule must be followed:

  • Weighing / Level Checking: All CO₂ cylinders must be weighed or checked using ultrasonic level indicators at least once every two years. If any cylinder shows a loss exceeding 10% of its original content, it must be refilled or replaced.
  • Hydrostatic Testing and Internal Inspection:
    • At least 10% of the total number of cylinders must undergo internal inspection and hydrostatic testing every 10 years.
    • By 20 years, all cylinders (100%) must have been tested at least once.
    • After this period, all cylinders must be tested at intervals not exceeding 10 years.