Q9 (16 Marks) Lubrication & Bearings
MEP • Written Exam

(a) What are the indications of a tube leak in water tube boiler on a ship? Describe the signs and symptoms that engineers should monitor to detect tube leaks early. (8)

(b) Outline the procedure for plugging a leaking tube in a water tube boiler. Include the steps for isolating the affected area, preparing the tube and plug for plugging and ensuring the repair is secure and compliant with safety standards (8)

Appeared In: Nov 2024

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready
Part (a)

INDICATIONS OF A TUBE LEAK IN A WATER TUBE BOILER

Signs and symptoms to monitor:

  • Small leakage:
  • A slight drop in boiler water level (feed water consumption increases).
  • A slight increase in the feed water flow/ make-up.
  • A hissing/ steam sound in the boiler (steam escaping into the gas side).
  • A slight increase in the boiler pressure/ temperature fluctuation.
  • Moisture/ steam at the boiler casing/ inspection openings.
  • Large leakage:
  • A rapid drop in boiler water level (alarm/ low-level trip).
  • A large increase in feed water flow.
  • A loud steam/ water leak sound.
  • Steam/ water escaping from the boiler casing, flue or stack.
  • A drop in boiler pressure/ steam output.
  • Possible water hammer/ vibration.
  • A rise in the flue gas temperature (less heat absorbed) or a change in the gas analysis.
Part (b)

PROCEDURE FOR PLUGGING A LEAKING TUBE IN A WATER TUBE BOILER

  1. Isolate the boiler: Shut off the fuel/ firing, shut off the steam and feed water, and allow the boiler to cool and depressurise. Isolate the boiler from the steam/ water system.
  2. Identify the leaking tube: Locate the leaking tube by inspection (steam/ water marks, or by pressurising the water side and observing). If the tube is within the tube bank, it is identified by the leak location/ by isolating sections.
  3. Prepare the tube and plug: Clean the tube ends (inside) at the drum/ header. Select a suitable plug (a tapered/ threaded plug of the correct material, or a welded plug) of the correct size.
  4. Fit the plug: Insert the plug into the tube end at the drum/ header and secure it - either by driving/ expanding a tapered plug, by screwing in a threaded plug, or by welding a plug over the tube end (as per the maker/ Class-approved method). The plug must be fitted at both ends of the tube (top and bottom) to isolate it completely.
  5. Ensure the repair is secure: The plug must be tight and leak-free. For welded plugs, the weld must be sound and inspected. For mechanical plugs, the plug must be driven/ expanded to seal.
  6. Pressure test: After plugging, carry out a hydraulic test (or a steam/ water test) to confirm the plugged tube is leak-tight and the boiler is safe.
  7. Compliance: The plugging must comply with the maker's/ Class requirements; the number of plugged tubes is limited (a boiler with too many plugged tubes may need re-tubing). Record the plugging and, where required, obtain surveyor/ Class approval.
  8. Return to service: Refill the boiler, bring it back on line, and monitor for any further leaks.