Q9 (16 Marks)
Engine Operation & Maintenance
🔥
Repeated 9x in exams
MEP • Written Exam
Under Continuous survey of machinery (CSM) Cross head bearing of a large 2-stroke slow speed engine is due for survey.
(a) As second engineer, explain the procedure involved in complete inspection of a Cross head bearing. (8)
(b) List the precaution to be taken. (2)
(c) Indicate the reasons for possible defects which could be encountered and state how they may be rectified. (3)
(d) What test are carried out on completion of survey and re-assembly (3)