Q1 (16 Marks)
Surveys & Drydocking
🔥
Repeated 5x in exams
SC&S • Written Exam
(a) Explain in detail, how an underwater survey is carried out. (7)
(b) State the requirements to be fulfilled before an under -water survey is acceptable to the survey authority. (5)
(c) Construct a list of the items in order of importance that the underwater survey authority should include. (4)
Appeared In:
Jul 2026Oct 2024Sep 2022Jan 2019Mar 2018