Q2 (10 Marks)
Surveys & Drydocking
🔥
Repeated 7x in exams
SC&S • Written Exam
With reference to dry-docking, define the responsibilities of the Second Engineer and instructions to Junior Engineers:
(a) Prior to docking
(b) Whilst the vessel in dry dock
(c) Prior to flooding and leaving the dock.
Appeared In:
Jan 2026Dec 2025Jan 2025Nov 2024Oct 2023Dec 2022Jul 2018