Q3 (10 Marks)
Surveys & Drydocking
🔥
Repeated 9x in exams
SC&S • Written Exam
With reference to Underwater Inspection in lieu of Dry docking (UWILD):
(a) Explain in detail, how an underwater survey is carried out. (6)
(b) State the requirements to be fulfilled before an underwater survey is acceptable to the surveying authority. (6)
(c) Construct a list of the items in order of importance that the underwater survey authority
should include. (4)
Appeared In:
Sep 2025Jul 2025Apr 2025Apr 2023Dec 2019Sep 2019Apr 2019Dec 2018Aug 2018