Q2 (10 Marks) International Conventions πŸ”₯ Repeated 13x in exams
SSEP β€’ Written Exam

Prepare a proposal for safe manning requirements for a ship of your choice considering the IMO guidelines on the issue, also considering frequent port calls, rest hour management and high-risk areas.

Appeared In: Apr 2026Mar 2026Jan 2026Oct 2025Jul 2025Apr 2025Feb 2024Dec 2023Aug 2023Jun 2023Oct 2021Aug 2019Jul 2019

βœ“ Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready

SAFE MANNING MANUAL

For a 26,000 GRT Bulk Carrier

1. Purpose

The purpose of this manual is to ensure that the vessel is safely manned in accordance with:

  • International Maritime Organization (IMO) Resolution A.1047(27)
  • SOLAS Chapter V, Regulation 14
  • STCW Convention
  • Maritime Labour Convention (MLC)
  • ISM Code

This manual also takes into account:

  • Frequent port calls
  • Rest-hour management
  • High-risk/piracy areas
  • Cargo and emergency operations

2. Ship Particulars

Item

Details

Ship Type

Bulk Carrier

Gross Tonnage

26,000 GRT

Trading Area

Worldwide

Engine Room

UMS

Cargo

Dry Bulk Cargo

Port Frequency

Frequent

3. Safe Manning Objectives

Safe manning arrangements shall ensure:

  1. Safe navigation and watchkeeping
  2. Safe cargo handling operations
  3. Safe engine-room operation
  4. Pollution prevention
  5. Compliance with rest-hour regulations
  6. Emergency preparedness
  7. Security duties during high-risk area transit

4. Minimum Manning Scale

Deck Department

  • Master – 1
  • Chief Officer – 1
  • Second Officer – 1
  • Third Officer – 1
  • Bosun – 1
  • Able Seaman – 3
  • Ordinary Seaman – 1
  • Deck Cadet – 1

Engine Department

  • Chief Engineer – 1
  • Second Engineer – 1
  • Third Engineer – 1
  • Fourth Engineer – 1
  • Electro-Technical Officer (ETO) – 1
  • Oilers/Motormen – 3
  • Engine Cadet – 1

Catering Department

  • Chief Cook – 1
  • Steward – 1

Total Crew: 20

Additional manpower is maintained due to:

  • Cargo loading and discharging operations
  • Frequent port calls
  • Fatigue prevention
  • High-risk area transit

5. Watchkeeping Arrangement

Bridge Watches

Time

Officer

0000 – 0400

Second Officer

0400 – 0800

Chief Officer

0800 – 1200

Third Officer

The same watch schedule is repeated for the next 12 hours.

  • An Able Seaman (AB) lookout shall be posted at all times.

Engine Watches

  • UMS operation shall be maintained at sea.
  • Duty engineer shall remain on call.
  • Additional engine staff shall be available during manoeuvring and cargo operations.

6. Rest Hour Management

As per STCW requirements:

  • Minimum 10 hours rest in any 24-hour period
  • Minimum 77 hours rest in any 7-day period
  • Rest hours may be divided into a maximum of two periods
  • One period of rest must be at least 6 continuous hours

Fatigue Control Measures

  • Rest hours shall be recorded daily.
  • Overtime shall be monitored by the Master.
  • Compensatory rest shall be provided after heavy cargo operations.
  • Drills shall be planned to avoid excessive fatigue.

7. Frequent Port Call Management

Frequent loading and discharging operations increase crew workload due to:

  • Mooring operations
  • Cargo watchkeeping
  • Ballast operations
  • Hatch cover operations
  • Documentation work

Control Measures

  • Extra deck ratings shall be assigned during mooring operations.
  • Cargo watch rotation shall be carried out every 6 hours.
  • Additional engine attendance shall be maintained during port stay.
  • Non-essential maintenance work shall be postponed during busy operational schedules.

8. High-Risk Area Procedures

During transit through piracy-prone or high-risk areas:

  • Additional bridge lookout shall be posted.
  • Engine room shall be kept on standby condition.
  • Security patrols shall be increased.
  • Access control measures shall be strictly maintained.
  • Emergency anti-piracy procedures shall be kept ready for immediate use.

9. Emergency Preparedness

The vessel shall carry sufficient crew for effective response to:

  • Firefighting
  • Lifeboat launching
  • Flooding and damage control
  • Medical emergencies
  • Pollution response

Regular emergency drills shall be conducted without causing excessive disturbance to crew rest hours.

10. Master’s Responsibility

The Master shall:

  • Ensure compliance with safe manning requirements
  • Monitor crew fatigue levels
  • Maintain proper watchkeeping standards
  • Report unsafe manning conditions to the company

11. Company Responsibility

The company shall:

  • Provide qualified and certified crew
  • Ensure proper relief planning
  • Prevent excessive crew workload
  • Support fatigue management systems

12. Conclusion

Safe manning on a 26,000 GRT bulk carrier is essential for:

  • Safe navigation
  • Efficient cargo handling
  • Emergency response
  • Pollution prevention
  • Crew welfare
← Back to SSEP Question Bank Upload Recent Question Paper β†’