Q4 (20 Marks) Machinery & Systems 🔥 Repeated 11x in exams
SSEP • Written Exam

(a) State the instructions you as Second Engineer will give to watch keepers with respect to boiler uptake fire. (5)

(b) State how the incidence of uptake fires may be minimized. (5)

(c) State the reasons for blow-back from the furnace of an auxiliary boiler. (5)

(d) State the standing instructions you might have received from your Chief Engineer with respect to the avoidance of boiler furnace blow-back. (5)

Appeared In: Aug 2026Dec 2025Dec 2023Sep 2023Jul 2022Jun 2019Oct 2018Jul 2018Apr 2018Mar 2018Feb 2018

Verified Model Answer (Text Solution)

Structured for DG Shipping MEO Class II examination scoring criteria.

Exam Ready
Part (a)

As Second Engineer, in the event of a boiler uptake fire, I would instruct the watchkeepers as follows:

  • Immediately inform the Chief Engineer (C/E) and Senior Engineer.
  • Start the standby generator and bring it online. This secures power in case the main engine needs to be stopped.
  • Stop the main engine AFTER informing the bridge. This reduces oxygen supply to the fire.
  • Continue operating the boiler water circulating pump. This helps manage boiler temperature.
  • Do NOT use soot blowers. Using them will only accelerate the fire.
  • Ensure all exhaust valves are closed after the main engine is stopped to prevent further air supply to the fire.
  • Cover the turbocharger air filter. This prevents additional air from fueling the fire.
  • Start external boundary cooling. This helps to control the fire's spread.
  • If fitted, use water dosing to extinguish the fire.

If the soot fire cannot be controlled and escalates to a hydrogen or metal fire:

  • Stop the main engine (if not already stopped).
  • Stop the boiler water circulating pump.
  • Shut all inlet and outlet valves in the water circulating lines.
  • Drain water from the pipelines.
  • Continue boundary cooling.
  • If fitted with a fixed fire extinguishing medium, activate it.
  • Monitor the boiler uptake temperature.
  • Once the fire is extinguished, carry out thorough water washing.
  • Inspect the inside of the boiler uptake to assess the extent of damage.

(b) To minimize uptake fires, the following measures should be implemented:
  • Avoid slow steaming of the main engine for extended periods.
  • Ensure proper fuel combustion in the main engine.
  • Maintain the fuel system properly (fuel injection pumps, injectors, etc.).
  • Carry out regular soot blowing.
  • Regularly open up and clean the smoke side of economizer tubes.
  • Start the boiler water circulating pump at least two hours before starting the main engines.
  • Do not stop the boiler water circulating pump while the main engine is running.
  • Keep the boiler water circulating pump running for at least four hours after stopping the main engine.
  • Monitor uptake parameters (temperature, differential pressure drop, etc.).
  • Monitor gas emissions from the funnel.

(c) Blow-back during auxiliary boiler firing can occur due to:
  • Insufficient purging (pre and post) of the boiler furnace after flame failure. This is especially common when operating manually, as pre-purging isn't automatically controlled.
  • Accumulation of hydrocarbons inside the furnace.
  • Inefficient forced draft (FD) fan performance.
  • FD fan damper not opening fully.
  • Improper burner atomization.
  • Fuel dripping from the burner.
  • Improper maintenance of the boiler burner.
  • Malfunctioning fuel oil solenoid valve.

(d) To prevent boiler furnace blow-back, standing instructions from the Chief Engineer might include:
  • Allow sufficient time for pre-purging the furnace with dampers fully open. This ensures that accumulated vapours are expelled.
  • Purge for 5 to 6 times the furnace volume.
  • Never reduce or bypass the purging time.
  • Carry out boiler burner routines as per the Preventative Maintenance System (PMS).
  • Maintain the correct air-fuel ratio for complete combustion.
  • Ensure proper treatment of fuel oil fed to the boiler.
  • Conduct periodic furnace inspections to check internal conditions.
  • If a flame failure occurs, identify and rectify the root cause before attempting to re-fire.
  • Do not repeatedly attempt to re-ignite the boiler after a flame failure.

← Back to SSEP Question Bank Upload Recent Question Paper →