Explain the following terms/statements:
(a) Categories of Noxious liquid substance
(b) Special Areas as defined in MARPOL 73/78.
(c) Double hull tanker.
Explain the following terms/statements:
(a) Categories of Noxious liquid substance
(b) Special Areas as defined in MARPOL 73/78.
(c) Double hull tanker.
Structured for DG Shipping MEO Class II examination scoring criteria.
For the purpose of regulation, Noxious Liquid Substances are divided into four categories:
A "Special Area" means a sea area where, for recognized technical reasons in relation to its oceanographical and ecological condition and to the particular character of its traffic, the adoption of special mandatory methods for the prevention of sea pollution by oil/NLS/garbage is required.
As per Annex I:
As per Annex II:
As per Annex IV:
As per Annex V:
In 1992, MARPOL was amended to make it mandatory for tankers of 5000 DWT and more, ordered after July 6, 1993, to be fitted with double hulls, or an alternative design approved by IMO (Regulation 13, Annex I, MARPOL).
The requirement for double hulls, initially applied to new tankers, was extended to existing ships under the 1995 program, stipulating that all tankers would have to be converted when they reached a certain age. This measure was adopted to be phased in over a period of years.
Although the double hull requirement was adopted in 1993, proposals for accelerating the phase-out of single hull tankers were discussed. As a result, in April 2001, an IMO resolution adopted a revised phase-out schedule for single hull tankers, which entered into force on September 1, 2003. In 2003, further revisions to the requirements were made, accelerating the phase-out schedule even further. These amendments entered into force in April 2005. A new regulation on the prevention of oil pollution from oil tankers when carrying heavy grade oil banned the carriage of this in single hull tankers of 5000 DWT and above. For ships with 600 DWT to 5000 DWT, this ban applied no later than the anniversary of their delivery date in 2008. The final phasing out date for Category 2 and 3 tankers was brought forward to 2010 from 2015.