Q8 (10 Marks)
Materials
🔥
Repeated 2x in exams
MEP • Written Exam
Where a waste heat boiler is subject to persistent leakage at the tube/tube plate connection, state with reasons:
(a) The possible causes of such leakage (6)
(b) The effects of this leakage (5)
(c) Methods of effecting a permanent repair. (5)
Appeared In:
Jan 2023Nov 2022