Q5 (10 Marks) Fire
SSEP • Written Exam

(a) With a simple, neat sketch, show a carbon dioxide flooding plan suitable for engine room briefly explaining the components. (12)

(b) Purpose and location where the following are fitted (8)

(i) Time delay.

(ii) Relief valve.

(iii) Master valve.

Appeared In: Nov 2022

Model Answer Under Review