Q9 (10 Marks)
Fire
SSEP • Written Exam
(a) With a simple neat sketch show a carbon dioxide flooding plan suitable for engine room briefly explaining components (10).
(b) Location where following are fitted
(i) Time delay unit (2)
(ii) Relief valve (2)
(iii) master valve (2)
Appeared In:
Jul 2022