Deck General USCG Question #5108 (Set 158)

During storm conditions on a MODU, the mooring tensions should be adjusted so that __________.

Official USCG Answer & Rule Citation

Correct Answer: Option C — the maximum tension of the most heavily loaded line does not exceed the safe working load

MODU mooring line management during severe storms requires ensuring individual line loads never exceed their certified Safe Working Load (SWL). Exceeding SWL risks catastrophic parting, loss of stationkeeping, and severe structural damage to the mobile offshore drilling unit.