Deck General USCG Question #605 (Set 18)

How should you signal the crane operator to hoist?

Official USCG Answer & Rule Citation

Correct Answer: Option B — With forearm vertical and forefinger pointing up, move hand in small horizontal circles.

Standardized crane operation signals require a vertical forearm with the forefinger pointing upward, moving in small horizontal circles, to clearly instruct the operator to hoist the load.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.
Back to Deck General Sets