If a severe storm threatens the COASTAL DRILLER while elevated as shown in the Sample Load Form #3 (Drilling), the variable loads would have to be reduced by __________.
Official USCG Answer & Rule Citation
Correct Answer: Option C — 1,000.0 kips
Elevated mobile offshore drilling units facing severe weather must reduce variable deck loads by calculated safety margins, specifically 1,000.0 kips in this operational loading condition, to maintain foundation reaction within allowable soil capacities.