Deck General USCG Question #5207 (Set 162)

If uniformly distributed in the cantilever pipe rack of the COASTAL DRILLER, how much pipe can be placed in the cantilever pipe rack area when the cantilever has been extended 40 feet aft of the transom?

Official USCG Answer & Rule Citation

Correct Answer: Option C — 500 kips

Cantilever load charts account for bending moments induced on the substructure when extended. Extending the COASTAL DRILLER cantilever 40 feet aft increases overturning moments, reducing allowable uniform deck load capacity in the pipe rack to a maximum of 500 kips.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.
Back to Deck General Sets