Deck General USCG Question #1141 (Set 35)

If your Bunker-C barge has operated in salt water for more than 12 months in the 24 month period since it was last dry-docked, when is it required to be hauled out again?

Official USCG Answer & Rule Citation

Correct Answer: Option B — 30 months since last dry-docking

Liquefied Natural Gas (LNG) is transported as a boiling liquid at its atmospheric boiling point (approximately -162°C) in insulated cargo containment systems, maintained cold via cargo boil-off rather than high pressure or critical temperature.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.
Back to Deck General Sets