Deck General USCG Question #4232 (Set 135)

The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?

Official USCG Answer & Rule Citation

Correct Answer: Option C — 59 feet 2.7 inches

Under USCG National Maritime Center examination standards, the accepted correct answer is: 59 feet 2.7 inches.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.
Back to Deck General Sets