While elevated, the COASTAL DRILLER prepares for a severe storm. When the setback is lowered and placed in the pipe racks, it is considered as part of the __________.
Official USCG Answer & Rule Citation
Correct Answer: Option C — variable loads
Under USCG National Maritime Center examination standards, the accepted correct answer is: variable loads.