As Chief Engineer of a slow-speed diesel engine vessel equipped with an ALCAP fuel oil purification system. You note a definite increase in the rate at which the purifier sludge tank is rising. One of the first items to check on your system would be which of the following?
Official USCG Answer & Rule Citation
Correct Answer: Option A — The opening water solenoid for leak through.
Under USCG National Maritime Center examination standards, the accepted correct answer is: The opening water solenoid for leak through..
100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.