Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out?
Official USCG Answer & Rule Citation
Correct Answer: Option D — Secure and tag the supply circuit breaker in the open position.
Lockout/tagout safety procedures mandated by marine safety regulations require de-energizing equipment, opening supply circuit breakers, and securely applying physical locks and warning tags to prevent accidental energization while maintenance personnel are working on electrical systems.