Marine Electrical Systems USCG Question #498 (Set 17)

Before working on an electric cargo winch master switch or controller, what should be done?

Official USCG Answer & Rule Citation

Correct Answer: Option A — open the circuit breaker in the power supply and tag-out

Safety regulations under 46 CFR Subchapter J mandate opening the supply circuit breaker and applying rigorous lock-out/tag-out (LOTO) procedures prior to servicing any marine electrical controller or winch master switch.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.
Back to Marine Electrical Systems Sets