Laying down drill pipe from the derrick of a semisubmersible on location reduces the __________.

Official USCG Answer & Rule Citation

Correct Answer: Option D — natural roll period

Removing high vertical weight from the derrick lowers the overall center of gravity, increasing metacentric height ($GM$). A larger $GM$ results in a stiffer vessel and a shorter natural roll period.