Type a keyword to start searching...

Use ⌘K or Ctrl+K to search from anywhere
Pass Benchmark: 70% (21/30) Standard: USCG NMC / 46 CFR

USCG Deck General (Set 133)

|
Question 1 of 30
Question Navigator
Correct Incorrect Pending Starred
Question 1 of 30

With no environmental forces on the DEEP DRILLER, the average of the starboard drafts is 59.0 feet, and the average of the port drafts is 61.0 feet. KGT is 52.84 feet. What is the value of TCG?

Browse Questions in Set 133

30 MCQs
#1 With no environmental forces on the DEEP DRILLER, the average of the starboard drafts is 59.0 feet, and the average of the port drafts is 61.0 feet. KGT is 52.84 feet. What is the value of TCG? #2 The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C3S. Pumping from tanks in the vicinity of the damage have proven ineffective. Your best countermeasure is to __________. #3 The DEEP DRILLER, while loaded as shown in the Sample Load Form #4 (Drilling), suffers damage to the port aft column below the waterline. Pumping from tank 8P and 9P is not sufficient to prevent increasing port list and stern down trim. You should consider counterflooding in tank __________. #4 The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C3S. Your best countermeasure is to __________. #5 In MODU construction, bulkheads in the quarters are generally __________. #6 A semisubmersible which flops between port and starboard angles of list is likely to have __________. #7 For a floating MODU, the center of flotation is the point in the waterplane __________. #8 The DEEP DRILLER, loaded as shown in the Sample Load Form #4 (Drilling), discharges a non-liquid load of 275.8 long tons from a position 130 feet above the keel, 40 feet forward of amidships, and 30 feet to port of the centerline. What is the new GMT? #9 While the DEEP DRILLER is operating as shown in Sample Load Form #4 (Drilling), casing is accidentally dropped over the starboard side. If the starboard forward inclination is slowly increasing, which tank is probably damaged? #10 The DEEP DRILLER, at 60.0 feet draft in sea water, has VM = 974,441 foot-long tons, and FSMT = 18,732 foot-long tons. What is the metacentric height corrected for transverse free surface effects? #11 The COASTAL DRILLER has sufficient reserve stability to overcome damage due to flooding of any one watertight compartment in winds to __________. #12 The DEEP DRILLER departs a fresh water port at a draft of 20.5 feet. What will be the draft in sea water? #13 The DEEP DRILLER, at a draft of 60 feet, has a KGL of 55.4 feet and an LCG of 2.37 feet. What is the trim in feet? #14 A flooded leg on a liftboat would adversely affect the vessel's stability underway by __________. #15 A semisubmersible, while floating level, displaces 18,000 long tons. Bulk, weighing 400 long tons, is placed in P-tanks located 80 feet to starboard of the centerline. What is the new TCG? #16 The COASTAL DRILLER's ability to meet the damage stability criteria depends on maintaining watertight integrity, displacement less than 14,158 kips, level attitude, and KGT and KGL less than __________. #17 A semisubmersible with a negative GM flops to an angle of __________. #18 While the DEEP DRILLER is operating as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the port side. If the port aft inclination is slowly increasing, which tank is probably damaged? #19 The DEEP DRILLER, at 60.0 feet draft in sea water, has VM = 974,441 foot-long tons, LM = 40,301 foot-long tons, TM = 3 foot-long tons, FSML = 30,572 foot-long tons, and FSMT 18,732 foot-long tons. What is the KG corrected for transverse free surface effects? #20 The DEEP DRILLER is loaded as shown in the Sample Load Form #2 (Ballasting to Survival). What is the metacentric height corrected for longitudinal free surface effects if 100.76 long tons of ballast are added to Ballast Tank #8S to replace the discharge of all bulk materials? #21 The maximum draft to which a drilling unit may be safely loaded is called __________. #22 The DEEP DRILLER, loaded as shown in the Sample Load Form #4 (Drilling), discharges a non-liquid load of 275.8 long tons from a position 130 feet above the keel, 40 feet forward of amidships, and 30 feet to port of the centerline. What is the new TCG? #23 The intact volume above the waterline of a floating MODU is __________. #24 Laying down drill pipe from the derrick of a semisubmersible on location reduces the __________. #25 The DEEP DRILLER is level at a draft of 60 feet in calm water. What is the value of the righting moment? #26 Failure of both port-side ballast pumps on the DEEP DRILLER prevents their use. To dewater from the port forward tanks, you should use the __________. #27 In order to withstand fluid head pressure on a MODU, stiffeners are often attached to the bulkhead __________. #28 Vertical partitions which provide strength and compartmentalization on a MODU are called __________. #29 The DEEP DRILLER is loaded as shown in the sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #4 (see table 8) is dumped, what would be the new uncorrected height of the center of gravity? #30 The DEEP DRILLER is loaded as shown in the Sample Load Form #1 (Transit). What is the new longitudinal free surface correction (FSCL) if the entire contents of Salt Water Ballast Tanks 1P and 1S are discharged?

Question Discussion & Notes

0

Have a doubt, memory trick, or exam update? Share your insights with fellow mariners.

Leave a Comment / Clarification

By posting, you agree to our Terms & Moderation Policy.

Loading mariner discussions...