Engine Plants (Supplementary) USCG Question #868 (Set 9)

The 3rd engineer on watch reports than the ship has an erratic rolling behavior and it does not appear to stabilize at an even keel position. As Chief Engineer, after consultation with the Chief Mate, what instruction would you give him?

Official USCG Answer & Rule Citation

Correct Answer: Option A — Add ballast to a center line double bottom tank.

Under USCG National Maritime Center examination standards, the accepted correct answer is: Add ballast to a center line double bottom tank..