Which of the indicator diagrams illustrated indicates the condition that should be corrected by retarding the timing, and the fitting of thicker shims to the connecting rod? Illustration MO-0029
Official USCG Answer & Rule Citation
Correct Answer: Option D — D
Diagram D exhibits high peak pressures caused by advanced timing combined with reduced clearance volume, requiring both injection retarding and thicker connecting rod shims to lower compression.