Type a keyword to start searching...

Use ⌘K or Ctrl+K to search from anywhere
BIGF Exit Exam • Set 6 Question 30 of 30

For each main gas supply line entering an ESD protected machinery space, and each gas supply line to high pressure installations

✓

Direct Answer

Option A: Means shall be provided for rapid detection of a rupture in the gas line in the engine-room.

For main gas supply lines entering ESD-protected machinery spaces, automated monitoring must provide rapid detection of any pressure drop or line rupture to trigger instantaneous fuel trip valves.

All Options

A
Means shall be provided for rapid detection of a rupture in the gas line in the engine-room. (Correct Answer)
B
The pipelines should be always double walled
C
In case of gas leakage an automatic alarm should actuate
D
Due to redundancy there should not be any unacceptable loss of power

Detailed Explanation & Context

For main gas supply lines entering ESD-protected machinery spaces, automated monitoring must provide rapid detection of any pressure drop or line rupture to trigger instantaneous fuel trip valves.

Relevant Framework: STCW 2010 Manila Amendments • DG Shipping E-Learning & Exit Exam Standards • Basic Training for Ships subject to the IGF Code (BIGF).

Advertisement

Practice Full BIGF Set 6

Test yourself with 30 interactive questions, live timer, and instant score.

Launch Practice Simulator →

Question Discussion & Notes

0

Have a doubt, memory trick, or exam update? Share your insights with fellow mariners.

Leave a Comment / Clarification

By posting, you agree to our Terms & Moderation Policy.

Loading mariner discussions...