Type a keyword to start searching...

Use ⌘K or Ctrl+K to search from anywhere
RPST Exit Exam • Set 6 Question 13 of 30

Which one of the listed requirements regarding hydrostatic release arrangements for life rafts does not correspond to present regulations?.

✓

Direct Answer

Option D: Be provided with painter system with a breaking strength of not more than 2.2 KN

Hydrostatic release units (HRUs) are designed with a painter system that breaks at a specific load, typically around 1.5 to 2.2 KN, to ensure the raft deploys automatically. The stated breaking strength is within regulatory limits.

All Options

A
Hydrostatic release units shall be permanently marked with type and serial number
B
Be constructed as to prevent release by sea washing over the unit
C
Be constructed of compatible material to prevent malfunction
D
Be provided with painter system with a breaking strength of not more than 2.2 KN (Correct Answer)

Detailed Explanation & Context

Hydrostatic release units (HRUs) are designed with a painter system that breaks at a specific load, typically around 1.5 to 2.2 KN, to ensure the raft deploys automatically. The stated breaking strength is within regulatory limits.

Relevant Framework: STCW 2010 Manila Amendments • DG Shipping E-Learning & Exit Exam Standards • Refresher Personal Survival Techniques (RPST).

Advertisement

Practice Full RPST Set 6

Test yourself with 30 interactive questions, live timer, and instant score.

Launch Practice Simulator →

Question Discussion & Notes

0

Have a doubt, memory trick, or exam update? Share your insights with fellow mariners.

Leave a Comment / Clarification

By posting, you agree to our Terms & Moderation Policy.

Loading mariner discussions...