A ship of displacement 14800T, KM 10.4, KG 9m was floating upright. Subsequently, the following operations were carried out:
(a) 210 tons loaded at KG 7.2m, 6m to stbd of centerline.
(b) Removed 280 tons from tank, being 7 m to port of centerline.
(c) 75 tons of ballast was shifted from 3 port DB to 3 stbd DB through 14m.
Find the resultant list.