GSK Exit Exam • Set 3 Question 5 of 30
Cargo hold washing are pumped out
✓
Direct Answer
Option B: Through the hold bilges
After cargo hold washing, the resulting water is typically pumped out through the hold bilge system. This system collects and pumps liquids from the lowest part of the hold overboard or to a slop tank.
All Options
A
Into the engine bilges
B
Through the hold bilges
(Correct Answer)
C
Into the side
D
Through the double bottom tank
Detailed Explanation & Context
After cargo hold washing, the resulting water is typically pumped out through the hold bilge system. This system collects and pumps liquids from the lowest part of the hold overboard or to a slop tank.
Relevant Framework: STCW 2010 Manila Amendments • DG Shipping E-Learning & Exit Exam Standards • General Ship Knowledge (GSK).