Under standard electrical installation codes, the minimum allowable clear workspace depth in front of electrical switchboards and control gear is typically:

Direct Answer

Option A: 36 inches (approx. 0.9 to 1.0 m)

Standard industrial codes (NEC / NFPA 70 / IEC) require a minimum clear workspace depth of 36 inches (0.9 m) in front of low/medium voltage panels to allow unimpeded escape during emergencies.

All Options

A
36 inches (approx. 0.9 to 1.0 m) (Correct Answer)
B
48 inches
C
24 inches
D
12 inches

Detailed Explanation & Context

Standard industrial codes (NEC / NFPA 70 / IEC) require a minimum clear workspace depth of 36 inches (0.9 m) in front of low/medium voltage panels to allow unimpeded escape during emergencies.

Relevant Framework: STCW 2010 Manila Amendments • DG Shipping E-Learning & Exit Exam Standards • High Voltage Safety Officer & Switchgear Operations (HV).

Advertisement

Practice Full HV Set 5

Test yourself with 30 interactive questions, live timer, and instant score.

Launch Practice Simulator →

Question Discussion & Notes

0

Have a doubt, memory trick, or exam update? Share your insights with fellow mariners.

Leave a Comment / Clarification

By posting, you agree to our Terms & Moderation Policy.

Loading mariner discussions...