USCG USCG Safety Eng
Set 2 • Question #42 of 254
Launch Interactive Practice Room An acceptable method of dealing with accumulated oil found in the pump room bilges is to __________.
A
pitch
B
surge
✓ Correct Answer
C
sway
D
heave
USCG NMC Regulatory Explanation
Under MARPOL, SOLAS, and USCG Marine Engineering Safety regulations, regarding 'An acceptable method of dealing with accumulated oil found in the pump room bilges is to', the mandated standard is: 'surge'.